Dozens of firms now sell rooftop solar here, and their quotes look alike. Yet their results do not. This guide to rooftop solar companies in Bangladesh shows how they differ. It also shows what to check, what to avoid, and what to ask before you sign. The aim is simple: you should leave with a clear way to judge any firm, so the choice is yours and not the salesperson's.
In short, a rooftop solar company puts panels on your roof and links them to your power supply. Good firms do far more than that.
A full job has six parts:
Site check. They study your roof, shade, and power bills.
Design. They size the system to your load, not just your roof.
Supply. They buy panels, inverters, frames, and cables.
Install. Their crews fit the system safely.
Approval. They file the net metering forms with your power firm.
Care. They wash, check, and fix the system for years.
Some firms do all six, but others do only one or two. So the first question is always the same. Who does what on my job?
First, know that four kinds of firms work in this market. Each suits a different buyer.
Full-service EPC firms. EPC means engineering, procurement, and construction. One team designs, buys, builds, and hands over. You get one contact, and one firm to hold to account. So these firms suit factories, offices, and larger roofs.
Installers. They fit systems that you or another party designed and bought. They can be fast and cheap. But then the design risk then sits with you.
Equipment traders. They sell panels and inverters. Some also offer fitting through partners. So ask who does the work, and who answers if it fails.
Finance-led providers. They offer lease or pay-as-you-go deals with little upfront cost. In return, though, you share the savings for years. Read these contracts with care.
None of these types is bad. Still, a mismatch hurts. A large factory with a trader-and-crew setup, for example, may find nobody owns the whole result.
The market is growing fast. A Centre for Policy Dialogue (CPD) briefing from August 2026 counts 4,551 net-metered rooftop systems with 213.3 MW of capacity. In fact, about 1,531 were added in 2025, up from roughly 585 in 2024. Also, industrial roofs alone hold 828 systems and about 77.5 MWp (source).
Growth brings choice. But it also brings risk. However, the same briefing says installation and commissioning practice is uneven. Quality checks and upkeep are weak, and independent inspection is limited. It adds that poor installations have hurt consumer trust.
So the firm you pick matters as much as the panels. And a weak install can cut output for 25 years.
Use these checks on every firm, and score each one from 1 to 5, then compare totals.
First, ask for finished projects of your size and roof type. A firm that fits home roofs may not suit a garment shed. Also visit one site if you can, and speak to the owner.
A good firm studies your bills and your roof. It then sizes the system to your daytime load. Be wary of a firm that quotes before it visits.
Panels, batteries, inverters, and meters must meet technical standards set by BSTI and SREDA, according to the power division's rules for the new incentive. So ask for datasheets and test reports. Then match the brand on the quote to the brand on the box.
Approval, however, is where many jobs stall. CPD notes that several agencies, each with its own steps, can delay projects. So ask how many approvals the firm has won at your power distributor. Ask who files the forms, too.
Good quotes list panels, inverters, frames, cables, labour, duties, and VAT on separate lines. One lump sum hides weak spots.
Panels often carry 25-year output warranties, but inverters carry shorter ones. So ask who handles claims, and how fast. A firm that vanishes after handover is a hidden cost.
Work at height is risky. Ask whether the firm uses its own trained crews or hires them by the day. Also ask to see its safety plan.
Some signs should slow you down.
A quote without a site visit. The firm cannot size a system it has not seen.
Output promises with no basis. Ask how the firm reached its number.
No itemised price. Lump sums hide cheap parts.
Pressure to sign today. A fair offer will still stand tomorrow.
Vague answers on approvals. If nobody owns the forms, delays follow.
No references. Good firms are proud to show past work.
An unusually low price. It may mean weak parts or thin support.
One red flag may be a mistake, but three mean you should walk away.
Price alone misleads. Compare cost against output instead.
First, take three numbers from each quote: the system size in kW, the total price, and the yearly output the firm expects. In Bangladesh, a well-built system makes about 1,400 kWh per kW each year. But if a firm claims far more, ask why.
IEEFA puts the possible saving for industrial users at about $0.061 per kWh, based on the daytime grid rate and the cost of solar (source). So use your own power bill for a better figure.
Here is a quick test. Here, each kW saves about 1,400 × $0.061 = $85 a year. Then divide the quoted price per kW by $85, and the answer is a rough payback in years. For example, a quote of $700 per kW gives about 8.2 years, while a quote of $500 per kW gives about 5.9 years. These are illustrations, not prices. Your real numbers will differ.
Then check what each quote leaves out. Look for duties, roof repairs, and an inverter swap later. A cheap quote that leaves these out is not cheap.
Bring this list to every meeting.
Who designs the system, and who fits it?
Can I visit a finished project of my size?
Which brands will you use, and do they meet BSTI and SREDA standards?
How long will the net metering forms take, and who files them?
What yearly output do you expect, and how did you work it out?
Who handles warranty claims, and what do they cover?
Do you offer upkeep, and what do you advise?
If my roof needs repairs first, how does that change the plan?
How is payment split across the job?
If the system underperforms, what happens next?
Write the answers down. Then compare them across firms. In general, the clearest answers usually come from the strongest firms.
First, ask each firm for a written timeline. A sound plan for a mid-size business roof follows this order, though your dates will differ:
First weeks: roof survey, bill review, and a draft design.
Next: final design, signed quote, and net metering application.
Then: equipment orders and delivery.
After that: installation, which often takes weeks and not months.
Last: utility inspection, grid link, and handover.
Delays usually come from forms and late gear, not from the fitting itself. So a firm that explains each step, and names who owns it, has likely done this before.
But the deal does not end when the panels go live. Good rooftop solar companies in Bangladesh stay involved.
Ask for a monitoring screen that shows daily output. Then compare it with the design figure each month. A steady drop points to dirt, shade, or a fault. So ask the firm to visit, and note how fast it responds. Its reply tells you how it will act over the next 25 years.
Also agree on a cleaning plan. After all, dust, rain, and bird droppings all cut output. Finally, keep your warranty papers, test reports, and drawings in one folder.
A good firm keeps up with policy and tells you plainly what applies. So ask about these points.
Net metering. You use your own solar power first. Then extra power goes to the grid and offsets your bill. The guidelines began in 2018 and were revised in August 2025.
The battery incentive. Rooftop systems with batteries earn Tk 10.50 per unit for surplus power sent to the grid. However, you must finish the install by 28 February 2027. Also, the rate runs to 28 February 2030. Payments come every three months into a bank account (source).
Standards. As noted above, equipment must meet BSTI and SREDA standards.
Ask each firm to explain how these rules affect your job. Then check the answer against the official guidelines. A firm that cannot explain them is not ready for your roof.
So the right firm depends on who you are.
Homes. CPD puts a complete home system at roughly Tk 80,000 to Tk 250,000 or more. For homes, look for a firm with a simple package, a fast approval record, and local service. Also, many home owners pay with their own cash. In fact, CPD found that 63.6 percent of net-metered systems were self-funded.
Businesses. Factories and offices need load studies, stronger roofs, and bigger approvals. So look for a full-service EPC firm with a track record on larger roofs. Ask how it keeps your production running while crews work.
In both cases, however, the same rule applies. The firm should size the system to your real daytime use.
Gtech Infrastructure is a solar EPC company based in Dhaka. It lists commercial and industrial rooftop solar among its services. You can read about it on its commercial and industrial rooftop solar page.
Judge Gtech the way you would judge any firm. So ask it the ten questions above. Then ask for a site visit and an itemised quote. A fair firm welcomes that test.
Run through this list and confirm each line is true.
I have at least three itemised quotes.
Each firm visited my roof.
I compared cost per kW and expected output.
The brands meet BSTI and SREDA standards.
It is clear who files the net metering forms.
I saw a finished project and spoke to its owner.
The warranty is clear, with a named contact.
The install can finish before 28 February 2027, if I want the battery incentive.
If every line is true, you are ready to choose.
Choose a firm for its proof, not its promises. In short, the best rooftop solar companies in Bangladesh design for your load, use approved gear, handle approvals, and stay around after handover. The weakest sell a price and vanish.
Take your time. So get three quotes, ask the hard questions, and see a finished job. A careful choice now protects 25 years of savings.
view more

Top solar company in Chottogram: how to choose one for your site


Top solar provider in Bangladesh: how to judge one before you sign
Need help choosing?
As land-use pressure increases across Europe, Agri-PV is becoming an increasingly relevant solution.

Rapid Response
Expert Guidance at Every Step
Support